Pre Construction Stages

 

Initial Meeting:

  • Get to know you
  • Qualifications, References and Accomplishments of Joseph Fowler Homes
  • Explain the Process
  • Review Plans ( if available)
  • If no Plans, Discuss Architects and Plan Process
  • “Listen” to Expectation and Visions for the Project
  • Fill out Specifications Questionnaire for Preliminary Budgets
  • Discuss Budget and Expectations
  • Discuss Time Frame for Bidding Process
  • Discuss Professional Services Agreement and Construction Contract
  • Set Next Meeting 

 

Progress Meeting:

  • Submit Preliminary Bid
  • Review and Discuss Options

 

Submit Proposal:

  • Finalize a “Professional Services Agreement”
  • Discuss Residential Construction Contract
  • Establish Time Line for Selections and Decorating
  • Discuss Importance of Complete Selections and Change Order Process

 

Finalize Residential Construction Contract:

  • Establish a Final Contract Based on Selections and Decorating
  • Establish a Job Schedule
  • Establish a Draw Schedule
  • Collect Deposit

 

Begin Preliminary Construction Process:

  • Submit Plans for Permitting
  • Prep Lot and Survey Building Envelope
  • Have Financing Established

 

Begin Construction

Construction Stages & Critical Path

 

Foundation Stage:

  • Lot Walk and Building Envelope Location
  • Form Set
  • Form Fill
  • Plumbing Rough –in
  • Plumbing Rough Inspection
  • Dig & Form Beams
  • Plumbing Rough Pipe Install
  • Pipe Inspection
  • Slab Steel & Cables
  • Electric Conduit Installed
  • Complete Form Boards
  • Engineering Inspection
  • Pour Foundation

 

Framing Stage

  • Plumbing Selections Finalized
  • Cabinet Selections Finalized
  • Roofing Selections Finalized
  • Frame Structure
  • Dry-In House

 

Mechanical Rough, Plumbing Rough, Electric Rough

  • HVAC Ducts and Furnace Installed
  • Plumbing PVC, Copper/PEX, Tubs, and Water Heaters Installed
  • Electric Wiring Installed
  • Security, Cable, Phone, Media and Home Network Wiring Installed

 

Quality Control, Inspections, Customer Walk

  • Builder Detailing
  • Frame Completion and Inspection
  • Mechanical, Plumbing, and Electric Rough Completion and Inspection
  • Order Cabinets and Verify Layouts
  • Customer Walk and Verification of Electric, Mechanical, and Plumbing Locations
  • Make Ready For Drywall and Insulate

 

Exterior Veneer Stage

  • Paint Exterior
  • Install Exterior Masonry Veneer
  • Install Roof

 

Drywall, Cabinets, Wood/Tile Flooring and Trim Stage

  • Inspect Insulation Install
  • Install Drywall
  • Inspect Drywall Install
  • Tape Float and Texture
  • Install Cabinets
  • Install Wood/Tile Flooring, Tub and Shower Surrounds
  • Install Trim
  • Order Countertops

 

Paint

  • Prep For Paint
  • Verify Colors
  • Paint and Stain

 

Detail Work and Installation Of Selections

  • Stain and Finish Hardwoods
  • Install Countertops
  • HVAC Set-out
  • Electric Final
  • Plumbing Final
  • Appliance Install
  • Install Mirrors & Shower Door
  • Clean Windows
  • Customer Walk
  • Detail and Fine Tune Home
  • Pour Flatwork
  • Interior and Exterior Clean-up
  • Landscape
  • Install Carpet
  • Paint Touch –up
  • Final Inspections
  • Order Meters
  • Start Electric, HVAC, & Appliances
  • Customer Orientation
Move In