Construction
Stages & Critical Path
Foundation
Stage:
- Lot Walk and Building Envelope Location
- Form Set
- Form Fill
- Plumbing Rough –in
- Plumbing Rough Inspection
- Dig & Form Beams
- Plumbing Rough Pipe Install
- Pipe Inspection
- Slab Steel & Cables
- Electric Conduit Installed
- Complete Form Boards
- Engineering Inspection
- Pour Foundation
Framing Stage
- Plumbing Selections Finalized
- Cabinet Selections Finalized
- Roofing Selections Finalized
- Frame Structure
- Dry-In House
Mechanical Rough, Plumbing Rough,
Electric Rough
- HVAC Ducts and Furnace Installed
- Plumbing PVC, Copper/PEX, Tubs, and Water Heaters Installed
- Electric Wiring Installed
- Security, Cable, Phone, Media and Home Network Wiring Installed
Quality Control, Inspections, Customer
Walk
- Builder Detailing
- Frame Completion and Inspection
- Mechanical, Plumbing, and Electric Rough Completion and Inspection
- Order Cabinets and Verify Layouts
- Customer Walk and Verification of Electric, Mechanical, and Plumbing Locations
- Make Ready For Drywall and Insulate
Exterior Veneer Stage
- Install Exterior Masonry Veneer
- Install Roof
Drywall, Cabinets, Wood/Tile Flooring
and Trim Stage
- Inspect Insulation Install
- Install Drywall
- Inspect Drywall Install
- Tape Float and Texture
- Install Cabinets
- Install Wood/Tile Flooring, Tub and Shower Surrounds
- Install Trim
- Order Countertops
Paint
- Prep For Paint
- Verify Colors
- Paint and Stain
Detail Work and Installation Of
Selections
- Stain and Finish Hardwoods
- Install Countertops
- HVAC Set-out
- Electric Final
- Plumbing Final
- Appliance Install
- Install Mirrors & Shower Door
- Clean Windows
- Customer Walk
- Detail and Fine Tune Home
- Pour Flatwork
- Interior and Exterior Clean-up
- Landscape
- Install Carpet
- Paint Touch –up
- Final Inspections
- Order Meters
- Start Electric, HVAC, & Appliances
- Customer Orientation
Move In
|